Wednesday, April 1, 2009

Filling the shoes of the missing

Well, I spent pretty much the entire day in the shop. I don't mind working in the shop, but I prefer testing. I started by taking an 8 year old scrap panel and dicing it into 3" wide lengths. Then I milled a 15° edge down the one side leaving roughly 1/16" of blunt edge of the 1/4" thick piece. Then I degreased, dried and sandblasted it to get it ready to adhere to the panel that will be tested (Switching to ASTM D3039 from dog-bone shaped coupons) The afternoon, I spent waterjetting a panel while assembling the two new chairs for the lab. Lastly I pitched in with the DCB-prep. All of this while the outside chiller is not operational (it died late yesterday, but the reset for the thermal overload was easily reset after some research by my coworker).

No comments:

Post a Comment